Electrical panel upgrades in North County San Diego
Permitted, inspected and finished by the licensed electrician who does the work.
When it is time to upgrade your electrical panel
An older or undersized panel is the most common thing standing between a home and an EV charger, solar, a heat pump or a remodel. If your breakers trip often, your panel is full, or you are adding a major load, a service upgrade makes the home safer and ready for what comes next.
What a panel upgrade includes
- 100A to 200A and larger service upgrades
- Meter-main and subpanel replacements
- Trenching and new underground conduit when the service requires it
- New panel with clean, labeled circuits
- Solar and battery ready
We handle the permits and the utility
The hard part of a service upgrade is the paperwork and coordination. We take all of it off your plate, so you deal with one licensed electrician from the first visit to the final inspection.
Everything handled
- PermitsPulled and closed out with the city.
- DigAlert and trenchingMarked, dug and conduit run correctly.
- SDG&E coordinationWork orders and utility scheduling.
- InspectionsEvery inspection scheduled and passed.
A service upgrade with trenching, step by step
Not every job needs every step. If your upgrade needs new underground service, this is what it looks like from first visit to final inspection.
- Free in-person estimate. We look at your panel and talk through what you need.
- We apply to the power company (SDG&E) for permission to upgrade.
- We meet the power company's planner, if needed.
- We wait for the power company's work order. It usually takes 1 to 3 months, and it can be faster for emergencies.
- We pull the city permit.
- We open an 811 DigAlert ticket so every buried line is marked before we dig.
- Once gas, water, power, phone and internet lines are marked, we meet the trench inspector.
- We trench from your panel to the power company's transformer.
- The first trench inspection.
- We lay the conduit.
- The second trench inspection.
- We backfill and compact the ground.
- The mandrel inspection, which proves the conduit is clear.
- We schedule the power company's shut-off and reconnect, in a morning or afternoon window.
- We schedule the city inspection for the same day.
- Panel upgrade day.
- After the city inspection passes, the power company reconnects your power.
- A final inspection if needed, usually once the stucco is closed up.
Recent panel upgrade projects
Real jobs, all permitted with SDG&E work orders and city inspections.
Before
After
Trench
Digging
Restored
Finished
During
Finished
Before
After
Before
After
Before
AfterCommon questions
How long does a panel upgrade take?
The work itself is only part of it. The power company's work order usually takes 1 to 3 months after we apply, and sooner in an emergency. Once everything is approved, the upgrade day is scheduled with the power company and the city inspector.
Will my power be off?
Yes, for part of the upgrade day. The power company disconnects your power and reconnects it after the city inspection passes. We schedule it for a morning or afternoon window.
Do I need a permit?
Yes. We pull the city permit and handle every inspection, so you do not have to deal with the city.
Who talks to SDG&E and DigAlert?
We do. We submit the application, work with the planner, open the 811 DigAlert ticket and schedule the shut-off and reconnect.
Do you upgrade commercial panels too?
Yes. We upgrade residential and commercial panels.
How much does it cost?
It depends on the service size, how far the trench has to run and the conditions on site. We start with a free in-person estimate and give you a clear quote.
Get a panel upgrade quote
Call or text, and include photos of your electrical panel and meter if you have them.
